Water damage? Emergency service at weekends too:Emergencies: +34 871 18 04 13
Home › Construction drying
Construction drying Mallorca

Construction drying in Mallorca: screed, plaster and paint dry faster.

For builders, developers and owners renovating: we deliver the right dehumidifiers to site and collect them again. With moisture readings if you need to know when floors are ready.

Dehumidifier in a finca room with a stone wall and terracotta floor

Why technical drying on site?

Screed, plaster and masonry release large amounts of water into the air as they dry. Without dehumidification the humidity stays high and it takes weeks until the next trade can start. A dehumidifier continuously pulls that moisture out of the air – so the schedule becomes predictable.

  • Screed ready sooner for tiles, parquet or vinyl
  • Plaster and filler dry evenly, paint adheres better
  • No mould in freshly renovated, closed rooms
Rule of thumb for cement screedRoughly one week of drying per centimetre of thickness up to 4 cm, considerably longer beyond that. Whether the screed is ready for flooring is decided by a moisture test (CM method), not the calendar. More in our guide on drying times.

Our units and prices

UnitUp toExtractionPer dayPer week
Trotec TTK 105 S80 m²30 l / 24 h€15€105
Trotec TTK 170 ECO90 m²52 l / 24 h€20€140
Trotec TTK 570 ECO220 m²110 l / 24 h€32€224

Delivery and collection cost a flat €99, wherever the site is on the island. All prices exclude 21 % IVA. Heaters, fans and condensate pumps can be added.

Terms for trades and developers

If you need dehumidifiers regularly or several at once, you get fixed terms, billing per site and priority availability. Just tell us roughly how many sites you run per year.

Frequently asked questions

Does someone need to empty the tank on site?

No, if you add a condensate pump. The water then drains straight away through a hose.

How many units do I need?

As a rough guide: one TTK 170 ECO for up to 90 m², one TTK 570 ECO for up to 220 m². With fresh screed or a lot of plaster, plan generously – we advise based on photos and a floor plan.

Can you measure whether the screed is ready?

We measure air humidity and surface moisture. The binding CM test before laying floors is usually done by the flooring contractor.

Fixed price in 30 seconds

Send photos on WhatsApp or use the calculator.

WhatsAppCall